Wait not less than per week prior to driving on The brand new driveway, and at the least per month right before parking heavy motor vehicles to the driveway. Hold out a month or two right before sealing the concrete. Suggestions: Every time a fill coat of pea gravel http://concrete-company-wheat-ri89000.blogocial.com/The-Basic-Principles-Of-concrete-driveway-replacement-38020338