The surplus wire provides plenty of slack to wire The brand new fixtures. If an attic is earlier mentioned the ceiling, operate the wire from the attic. If a concluded spot is earlier mentioned the ceiling, use a protracted flexible drill bit to drill in the joists and fish the https://fl64319.blogspothub.com/31471159/the-2-minute-rule-for-electrical-panel-clearwater