The 25mm thick large metal tube is pushed Together with the close closed by a steel shoe. On reaching the required driving resistance, a complete length cage is lowered in towards the tube and crammed with superior slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://fernandowfkps.madmouseblog.com/13046564/cast-in-situ-piles-secrets